neuvis
neuvis.live
Start a conversation

All sectorsIndustry25 / 48

Concrete and cement plants

To reviewMixer leaves without a logged delivery ticket

What it watches (physical WAF)

Rules ready on day one. Fitted to your zones, hours and thresholds.

  1. rule 01Mixers and delivery ticketsalert + log
  2. rule 02Load time per mixeralert + log
  3. rule 03People under the batching plantalert + log

What you measure

64
mixers dispatched
9 min
average load
1
exit without a ticket

Typical cameras, sensors and access points

  1. APlate reader at the mixer exit
  2. BCamera under the loading hopper
  3. CCamera over the aggregate yard

Equipment to start with

Edge SUPSI/O600400LPR ×2IP66

NV-CASETA-LPR

LPR gatehouse box

Pre-wired cabinet for one vehicle gate: hang it, connect it, it reads plates.

$68,000 MXN+ VAT
Datasheet